In 2016, Elizabeth Ingram wrote an article for HydroWorld outlining changes to the final design studies including the MW for El Chepete and El Bala.
Some of this information is outdated, but it helps to grasp the full scope of the issue.
In 2016, Elizabeth Ingram wrote an article for HydroWorld outlining changes to the final design studies including the MW for El Chepete and El Bala.
Some of this information is outdated, but it helps to grasp the full scope of the issue.